Год выпуска: 2014 Автор: Emil Bayramov and Manfred Buchroithner Издательство: LAP Lambert Academic Publishing Страниц: 148 ISBN: 9783659533815
Описание
The construction of Baku-Tbilisi-Ceyhan (BTC) Oil and South Caucasus Gas (SCP) pipelines was completed in 2005. The Azerbaijan section of BTC Oil and SCP Gas pipelines is 442 km long and 44 m wide corridor named as the Right-of-Way. BTC and SCP pipelines are aligned parallel to each other within the same 44m corridor. The construction process of the pipelines significantly disturbed vegetation and soil cover along Right-of-Way of pipelines. The revegetation and erosion control measures were conducted after the completion of construction to restore the disturbed footprints of construction activities. The general goals, dedicated to GIS- & Remote Sensing- based environmental monitoring of revegetation and planning of erosion control measures were: to evaluate the status of the revegetation in 2007 since the completion of the construction activities in 2005, to determine the climate and ground factors controlling the vegetation regrowth and to predict erosion-prone areas along...
Здравствуйте, хотел сказать что работа после вашего сопровождения прошла на отлично и да я полностью с вами согласен что оплата несоразмерна. Высылаю вам за сопровождение еще